Test Committee Conference call - 01/28/97

Attendees:
Dick Barton, SW Bell
Bill Belshaw, MCI
Andy Chalk, Sprint
Joe Clark, Bellcore
Carmen Colella, Ameritech
Dick Dowd, MCI
Mitch Fuchs, AT&T
Alan Gopin, AT&T
John Guthmann, Bell Atlantic
OC Jackson, AT&T
Gene Johnston, GTE

Meeting start at 08:30:

1) Overall Test Plan status

Bill, MCI, stated that the existing issue 1 is the final issue1. All
changes from now on will go into issue2. Added AT&T s Local and IXC
drawings and Ameritech s AIN Call flow drawings to Appendix A. Added to
www.cameos.com/lnp area.

Dick Barton, SW Bell, asked if the next draft would make a better
distinction between IXC and local test cases? Bill, MCI, stated that the
test cases do make the distinction. 

Also, Bill stated that the next issue will do a consolidated Table of
Contents which better defines the break out of sections.

2)  Test Interval

Dick Dowd, MCI, questioned the interval as 07/01/97 to 09/01/97. OC,
AT&T stated that the 08/15 to 09/01 interval was for cleanup, removal of
test numbers, retest, etc. We will treat the entire two months as the
interval and not differentiate the last two weeks.

Walt, AIT,  stated that, from Barry Bishop - Operations chair, the NANC
process flow compromises will probably impact the NPAC availability date
and push it out to 07/24/97. We will use this as the working assumption
and look at the new test dates as 07/28/97 to 09/26/97 with the report
taking 3 weeks (10/17/97). If it can be done earlier, we will.

Dick, MCI, motioned to change the name of the inter-company test
interval to "LRN Certification test" to remove the misconception that
this is a trial and enforce that TCs must be ready by 07/28. (editor s
note: The major focus is on the inter-company part and not on the
technology itself).

Carmen, AIT, stated that the operator services software for AIT, from
Nortel, will be VO on 07/19 at Wabash. AIT is working on getting two
other Operator Switches in the Chicago MSA. Also, Carmen will be
coordinating the validation queries for the Ameritech network as well as
for the inter-company certification.

3)  Inter-company test topography

The next face to face meeting (Feb 13) will spend much time on this
subject.

districts/NPA-NXXs for the individual companies.
to allow porting of numbers as well as the usage of unbundled ports,
etc.
codes, actual DNs, etc.

4)  911 Discussion

Andy Chalk, Sprint-Centel, brought up discussion about 911 tandem
interconnection between Sprint-Centel and Ameritech. Walt, AIT, asked
Andy to send e-mail to Barry Bishop, Operations chair, to be discussed
at the 911 Adhoc team meeting on 01/29/97. He agreed.

Note: Nancy DeRoo, AIT, will be sending updated test scripts to Walt,
who will forward to Bill, MCI, for inclusion in Issue 2 of the document.