Midwest Region LNP Operations
Sub-committee conference call
3-1-99
Attendees:
Tom Chowaniec - Ameritech Darin Liston - Sprint Local
Robin Meier - Ameritech Marla Gadbois – MCI/Worldcom
Liz Coakley - Ameritech Cynthia Hagan - McLeod USA
Mark Lancaster- AT&T Ann Hunt - McLeod USA
Jim Joerger MCI Elsa Morris - OHIO PUC
Bob Miller- Ameritech JoAnn Samonek- TCG
John Shay – Lockheed Martin Gene Perez - Intermedia
Sue Seitz - Ameritech
Next meeting scheduled for
3-15-99
9:00am CST. To 11:00am CST.
Meet-me bridge 312-814-8097
The subcommittee met to continue working the "Rules of Engagement issue" straw document, LNP Guidelines. The team started today where we left off at the 2-10-99 meeting. Each meeting we will mark where we left off and start at that point for the next meeting. After we have completed the first pass of the document we will fine tune, rework, look for redundancies, validate order of information, etc. before the final document is produced.
During document discussion and rework, the following items were captured at a very high level.
Document revisions from this meeting to be distributed under separate cover.
Discussion started with overview to-date, and prior to the point the group left off at during the 2-10-99 meeting.
Looked at Note 4:
Discussion on cut-off times
Begin at 2/10/99 cut off point
Interval discussion
Discussion indicated that generically there should be mention of intervals and they need to be negotiated between companies, however, intervals should not be detailed in this document.
Business days are not following NANC flows 2 or 4 days should be changed to 3 and 5 business days.
Projects
Remove the reference about paths as it related to interim NP.
Porting DID Numbers
Discussion on charges. Should charges be discussed in this document.
Partial Conversion
Content discussion
End User returns to Original
Discussion on disconnects
Supplemental Order
Discussion on acceptance of a supplemental order until the confirmed due date and time may not give enough time to generate a supplemental order. Discussion of coordinated vs. automated order. Tom will craft language for review, and will place a note in the document.
Cancellation Requests
Discussion surrounded the 30 minutes time frame, interconnection agreements, parity.
Baseline Cutover
Discussion to change ‘baseline’ to non-coordinated cutover process. Remove 8-5 reference, and 2 hour reference.
Coordinated Cutover
General discussion
After hours Cutover
General discussion
Question on when the CSR section would be discussed, as it was added after the initial review of the section. The thought would be to continue to review the document to the end, review the CSR section prior to reviewing the document for the second pass through.
The discussion will continue at the next meeting with the section marked " Local Operations Center".
Robin Meier