On Tuesday April 8, 1997 Walt Subora, Ameritech, held the April Test
Committee Meeting at the AT&T facility 227 West Monroe Street Chicago,
Illinois. The meeting started at
8:30 am CDT.
Executive Summary
-----------------
The SCP Sub-Committee provided a review of the FCC Field Test Plan.
They looked at it from an SCP point of view. Their suggestions are
indicated below. The Issues list was reviewed and updated. A tour
of the NPAC was provided. A list of Milestone's leading up to the
start of the FCC Field Test was put together. On the second day copy's
of the Draft Milestone list were circulated and reviewed. Minor changes
suggested. Jim Joerger asked to review the Issues list due to changes
that he felt needed to be noted.
Agenda
------
1. Introductions
2. SCP Committee comment's.
Section 3 of FCC Field Test Plan
3.2.2 SCP Function
Need to identify STP functionality as it relates to
passing CLASS, etc..
3.5.3
Add screening list.
3.6.1
Add message waiting indicators.
3.13 & 3.14 Combined on Network Management
GTT traffic
Section 4
Possibility of looping of messages.
Lunch
Worked on a timeline of milestones needed prior to 7/24. Input
these into MS Project. Barry Bishop will bring a copy of his
overall project milestones to tomorrow's meeting and we will be
able to double check to ensure
that we have not left out any milestones.
Reviewed the Issues and Actions
list.
Meeting broke up about 4:00 pm and Dick Dowd took a party of 10 for
a tour of the NPAC at 200 S.
Wacker.
April 9, 1997
Meeting was called to order by
Walt Subora at 8:30 am CDT.
Dick Dowd circulated copy's of the Illinois FCC Field Test Milestone
schedule on MS Project. The committee reviewed the draft, notes were
run spell check on it, check the opening of new NPA-NXX process for
timeline, change calendar to reference 7 day week instead of 5 day
work week. The draft will be worked by the SPOC Team, new tasks listed
and the inter-dependances listed. Future updates changes, etc., will
be handled by the SPOC Team.
ILLINOIS FCC FIELD TEST
Each SPOC to determine which Tests their company will be able
to perform during the FCC Field Test.
Develop a matrix of testing for
the FCC Field Test.
Determine which NPA-NXXs need to be opend to number portabiolity
to be able to perform the FCC
Field Test.
Submit registration to Lockheed
Martin NPAC for Interconnection.
Service Provider Profile to be
submitted to the NPAC.
Determine SSNs to be used by each
service provider.
Determine which phone numbers will
be used by each service provider.
Determine Point Codes will be used
by each service provider.
Determine alias Point Codes will
be used by each service provider.
Each SPOC to establish their
Testing Task Force.
Each SPOC to determine their TTNs.
FCC Field Test Topography
Determine Topography for Testing.
Determine which Interconnection Agreement's need to be in
place for the FCC Field Test.
Testing Interconnection agreement
needs to be developed.
Trunking in Place to support FCC
Field Test.
Trunking in Place for 911 testing.
Extracts to 911 DB.
SS7 Interconnection
Pass messages needed for SS7 to
support NP.
Place LSRs to order the opening of
NPA-NXXs.
Data Base Clean Up.
Establish SP Profiles with NPAC.
FCC Field Test.
Port first hone numbers.
Place LSRs to port the next set of
numbers.
---------------------------------------------------------------------------
Discussion relating to "How does a new SP obtain certification to provide
LRN services?"
911
---
Nancy DeRoo provided an update related to 911 testing, she will work
with Dick Dowd to schedule the 911 testing. She feels that this testing
can be accomplished within a couple of days. We should attempt to
place a 911 test shortly after porting a number onto your network.
A follow up test will need to be performed 24 hours later to verify
that the records have been properly updated. This indicates that Nancy
DeRoo will become a 911 SPOC representative to the SPOC Team to help
work through all 911 issues.
Each company is reminded to apply for a three digit company code and
register it with the NENA group. Cost for this is $100. Please take
care of this as soon as possible. There is a pointer on www.ported.com
pointing to the NENA web site for
information relating to this.
Single Point Of Contact Meeting Issues & Actions
===============================================================================
At least 4 of the particapating company's were represented so the Issues
and Status's were reviewed.
ISSUE: * The FCC Field Test Coordination Manager has requested that each
SPOC provide one person in the Chicago area 5 days for
the duration of the FCC Field Test. This person will need
to attend a daily kickoff meeting in person and be within
15 minutes of the NPAC to respond to emergency meetings.
ACTION: Each SPOC to work through this request with his/her company and
their resources to determine if this is workable and report their
findings to Dick Dowd via Email.
RESPONSIBLES: SPOC Team
STATUS: Assigned 3/20.
4/09 TCG / Rajeev Trika = TCG Rajeev will be in the
Chicago area and will be available for morning kickoff
meetings. He will also be able to meet with the SPOC
Team within 15 minutes of notification.
4/09 WorldCom / Betty Shelby -
Will support.
3/27 MCI / Hamp Oberle - Will
support.
4/03 AT&T / Eliene O'SHea -
ATT will support.
4/03 SPRINT / Larry Lovett - SPRINT is waiting to see the
outcome of this prior to making a
committment either way.
4/09 Ameritech / Barry Bishop - Ameritech after looking
into the issue further has decided that their original
answer will hold. Robert Bartenstein will be Ameritech's
single point of contact but will not travel to the Chicago
area. Robert will coordinate from his home office which
is out of Illinois. Ameritech feels that this will
not hamper the FCC Field Test.
Note. All Trial Participants will have representatived present
in the Chicago area to support the Chicago Illinois FCC Field
Test, or on call within 15 minutes of notification for a meeting
with the exception of Ameritech and possibly SPRINT.
Action: In the spirit of Team building Dick Dowd will escalate
to Brent Struthers, ICC, and request support from Ameritech
to match the level of committment provided by the other
participating company's.
RESPONSIBLE: Dick Dowd
STATUS: 4/09 Contacted Brent Struthers, ICC, via Email and requested
his assistance to help the participating company's to dedicate
resources to the FCC Field Test as
requested.
ISSUE: * The SPOC's Task Force will need technicians from all areas, within
their company that was impacted by LRN/LNP. This Task Force will
be utilized both to perform testing and resolve problems as they
might occur. The Task Force's will need to be dedicated to the field
test effort for at least 8 hours a day 5 days a week between 7/24
and 9/26, at a minimum. It is highly possible that at least some
week ends will also be worked. (NOTE) Not every member of the Task
Force will be needed 8 hours a day 5 days a week, only a core group,
each participating company will need to define this core group for
them selves.
ACTION: Each SPOC to work through this request with his/her company and
report their status to Dick Dowd
via EMail.
RESPONSIBLES: SPOC Team
STATUS: Assigned 3/20. Closed 4/09.
4/09 It was the consensus of those present that this
was an area that each company needs to work internally.
Each participating company has agreed to form a Team
to support their testing. These teams, the team members
and their contact phone numbers will not be made public.
This information is for the use of their company SPOC
only. Each company will hav their Testing Team ready
by 7/24.
ACTION: Each SPOC is to begin, if they have not already done so, to review
the FCC Field Test Plan, available at www.ported.com and
www.cameos.com, with their Task Force to determine which specific
test script's will be able to be performed by their company's
network topography within the Chicago MSA. (NOTE) Once this
input is obtained a matrix of test cases will be built that will
indicate each test case and which company's will be performing
which test cases. This will help to ensure that a through Field
Test is performed and also help to identify areas where some of
the participating company's can perform certain test's while others
perform other test's.
RESPONSIBLES: SPOC Team.
STATUS: Assigned 3/20.
4/03 TCG / Rajeev Trika -
Targeting 4/25/97.
4/03 MCI / Hamp Oberle - Targeting 4/25/97.
4/09 WorldCom / Betty Shelby - WorldCom will target 4/25/97.
4/09 Ameritech / Bob Bartenstien - Ameritech will be
performing as much testing as possible and as such will
not be identifying the individual test's that they will
perform.
4/03 SPRINT / Larry Lovett - SPRINT has just started looking
at the Test Plan.
4/03 AT&T / Elieen O'Shea -
AT&T still targeting 4/25.
ACTION: A date by which the Testing Matrix needs to be completed needs
to be determined. Each SPOC to discuss with their Task Force
and provide their input towards the date. This input should
be sent to Dick Dowd via Email.
RESPONSIBLES: SPOC Team.
STATUS: Closed. Provided that the participating company's can provide
their input on 4/25/97 the Field Test Coordination Manager
target's 5/8/97 to have a matrix available for review
by the SPOC team.
ISSUE: * In preparation for the FCC Field Test, certain network items
need to be gathered and
distributed to the participating company's.
ACTION: Each company is to determine what SSN will be used for CLASS
testing and which point codes will be utilized during the testing.
Each SPOC is requested to open these discussions within their own
company and report the status to
Dick Dowd Via Email.
RESPONSIBLES: SPOC Team
STATUS: Assigned 3/20.
3/27 TCG / Rajeev Trika - TCG will use a 5ESS Switch
The point code is 005004160.
TCG will have 10 DNs per prefix that are available for test:
773-420-xxxx-xxxx
847-720-xxxx-xxxx
847-813-xxxx-xxxx
630-274-xxxx-xxxx
630-743-xxxx-xxxx
815-280-xxxx-xxxx
SSN = 251
translation type = 251
alias point code = 232003000
3/30 Ameritech / Robert Bartenstien -
T-CAPS for CNAM and LIDB will be exchanged via the Regional
STP's:
CHCGILWB01W 250-001-000
ELGNILEL01W 250-000-000
ALIAS 250-002-000
In the Chicago area, T-CAPS for CLASS and ISVM (if needed)
will be exchanged via the Local
STP's:
DRFDILDF01W 250-003-000
RVDLILRD01W 250-004-000
ALIAS 250-005-000
And maybe this pair, depending on whether the CLEC decides to
link into these STP's (both pairs
are in LATA 358):
BNTOILBA01W 250-021-000
LGRCILLG01W 250-022-000
ALIAS 250-023-000
The following SCP's will actually be the nodes that send the
queries to their networks, and thus these point codes will
appear as originating point codes on the messages (the STP'S
will simply MTP route the messages, whether it be the LSTP's
or the RSTP's):
(LTNP SCP's HOMED TO BNTO/LGRC LSTP's)
CHCGILFRA52 250-080-001
EDNDILDUA51 250-080-002
ALIAS 250-080-000
(LTNP SCP's HOMED TO DRFD/RVDL LSTP's)
CHCGILWBA54 250-081-001
ELGNILELA53 250-081-002
ALIAS 250-081-000
Participants should provision their networks to receive queries
from any of these SCP's, regardless of which LSTP's they are
linked to, because we may shift traffic, due to load
requirements, between SCP pairs.
SSN 251 will continue to be the CLASS application number for
SSP's.
ISVM is 249.
telephone numbers that Ameritech will be using for the LNP
InterCompany test this summer:
Downers Grove
630-435-xxxx
630-435-xxxx
630-435-xxxx
630-435-xxxx
630-435-xxxx
Joliet Main
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx ISDN
815-726-xxxx
815-726-xxxx
815-726-xxxx ISDN
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx
815-726-xxxx
Stewart 1AESS
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
773-994-xxxx
4/09 WorldCom / Betty Shelby
targeting 4/25.
4/09 MCI / Hamp Oberle - Next
week.
4/09 AT&T / Eileen O'Shea -
Targeting end of the week.
4/07 SPRINT / Larry Lovett - received in person.
SWITCH NPA NXX RATE CENTER LRN TEST NUMBERS
Des Plaines 773 825 Chicago Ohare
5ESS 847 296 Des Plaines 847-296-xxxx
LNP Ready 297
5/9/97 298
Point Code 299
230-024-001 375
391
803
759 847-759-xxxx/xxxx
824
827
Park RIdge 773 380 Chicago Newcastle
DMS-100 399
LNP Ready 864
5/20/97
Point Code 847 318 Park Ridge 847-318-xxxx 847-318-xxxx
-
xxxx
RSTP (Johnson City/Bristol) Alais PC 239-001-000
LSTP (Lima/Mansfield) Alais PC
239-215-000
LRN AIN TT=11 SSN=248
LRN IN TT=11 SSN=236
CLASS TT=251 SSN=251
LIDB/ABS TT=253 SSN=253
CNAM TT=5 SSN=232
USVN TT=NUL SSN=NULL
ISSUE: * Each SPOC will need to contact person's within their own company
and determine with whom they have Interconnection Agreement's
existing with. It is highly likely that not all Field Test
Participants have Interconnection Agreement's with all other
participants. If this proves to be the case, the SPOC Team will
need to work out what can be considered a minimum agreement to
support the FCC Field Test.
NOTE It was the consensus of those present that little is to be gained
by looking at Inter-Connection Agreements. The real task is for
each SPOC to determine how their network is set up as far as trunking
to other service providers, SS7,
etc.
ACTION: Identify each participant's network's and trunking and
provide to Dick Dowd via Email ASAP. So that this information
can be combined and the FCC Field Test Topography can
be reviewed at the next
face-to-face.
RESPONSIBLES: SPOC Team
STATUS: Assigned 4/09.
ISSUE: * It was suggested that the SPOC Team assemble a Checklist of
all items that need to be addressed by each participating
company prior to the kick off of FCC Field Testing on July 24,
1997.
ACTION: Each SPOC is to initiate a Checklist of items that they feel
need to be addressed prior to July 24, 1997 and submit it
to Dick Dowd via Email. These will be shared with all
participating company's so that
the SPOC's can track progress.
RESPONSIBLES: SPOC Team.
STATUS: Assigned 3/20.
4/09 The Testing Committee put together a draft project plan
listing many milestones. Dick Dowd copied the tasks to MS
Project. Ameritech then printed copies and distributed them
to those present. These tasks were then reviewed by the
Testing Committee. Dick Dowd will rework the tasks and suggest
dependencies. Once this is formulated Dick will distribute
the Project Plan to the SPOC Team for review and finalization.
Dick will distribute this project plan prior to the next
SPOC Team conference call 4/17.
NEW ISSUES AS OF 4/09/97:
No new issues brought up during the meeting.
=======================================================================
ISSUES: * Test Script Prioritization, Overall Test Time Line & Porting
partners are all valid issues that will need to be addressed
but they are dependant upon
Action's above.
Thanks,
Dick Dowd
FCC Field Test Coordination Manager
LLC/ICC
972-498-5069
972-918-1499 fax
972-498-5022 alternate fax
Vnet 757-5069
Pager 1-800-PAGEMCI Pin# 1742797
Email Richard Dowd / MCI ID: 258-4443
Internet 2584443@mci.com