PPT Slide
- Assumption - interim period will be limited to non-contaminated blocks
- Interim Pooling Administrator will be in `place no later than 4-1-98
- Pooling Administror must be in place to support Pooling
- NPAC conversion requirements needed (M&P) to update NPAC SMS and all local LSMSs
- During interim manual pooling process - To avoid numerous notifications - Inter-SP ports should be coordinated