ICC Adhoc Test Committee Open Action Item review:

Items closed today (03/11/97) will be moved to closed list after April

meeting.

------------------------------------------------------------

ISSUE #:001

DATE OPENED: 07/16/96

DESCRIPTION: Do we need to test NPA splits as part of field test?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 01/06/97

DATE CLOSED:

STATUS: Open

07/16/96 - New Item

08/26/96 - Walt Subora to take this to NPAC team and get input on mass

downloads, etc. for test cases.

01/09/97 - On hold, Barry Bishop will look into this. Operations team

open issue #15.

03/11/97 - Proposal to simulate during the NPAC turn-up testing and also

then do real Split testing in Detroit.

------------------------------------------------------------

ISSUE #:006a

DATE OPENED: 08/26/96

DESCRIPTION: Want to include the NPAC test plan as an appendix to this

test plan.

RESPONSIBILITY: Barry Bishop, Operations Team will contact Donna

Navickas, NPAC team

DATE DUE: 01/06/97

DATE CLOSED:

STATUS: Open

08/26/96 - New Item

08/30/96 - Walt Subora and Barry Bishop will be meeting with the NPAC

team on Sep. 10 and/or 11 to talk about testing, schedules, etc. Will

bring back to this team.

12/11/96 - Discussion of how NPAC would be incorporated.

Most NPAC test plans are currently proprietary. Since they can't be

incorporated in the public test plan, a characterization of the coverage

is necessary in the master test plan, to show that it has been covered.

Sect 4.2.4 of test plan will have a matrix or summary which

characterizes the coverage. Then, at the conclusion of testing,

Lockheed would have to provide documentation of the test results.

01/09/97 - Lockheed will provide the final Turnup Test plan for the

addendum after it is final.

02/13/97 - NPAC committee is formally constructing this test plan and we

will get an update at the next meeting.

------------------------------------------------------------

ISSUE #:008

DATE OPENED: 09/17/96

DESCRIPTION: What is the definition of qualification tests for a

newcomer SP (Service Provider)?

RESPONSIBILITY: All

DATE DUE: 02/28/97

DATE CLOSED:

STATUS: Open

09/17/96 - New Issue

01/07/97 - We will select a set as part of the test plan and submit to

the Operations committee by March meeting.

02/13/97 - Bettie Shelby, Steve Markowski and Dick Dowd will work this

issue. They will draft their thoughts on this and present at this

committee at the March meeting.

03/11/97 - SP to SP testing will be handled by the NIIF (Robin s group).

NPAC is currently not part of that.

------------------------------------------------------------

ISSUE #:012

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.14 Choke Networks.

RESPONSIBILITY: Barry Bishop, AIT

DATE DUE: 11/04/96

DATE CLOSED:

STATUS: Open

10/18/96 - New Item

01/09/97 - Still on hold. These numbers are not portable. Providers will

have to hook up to tandem the same as we do to limit calls. Operations

open issue #41.

02/13/97 - Will keep in test plan but will not expand in the Illinois

forum for the MSA1 test. May need to expand when enter other MSA s.

03/11 - someone else in AIT??

------------------------------------------------------------

ISSUE #:015

DATE OPENED: 11/21/96

DESCRIPTION: How will calls from law enforcement agencies (not PSAPs) be

referred to the correct telco.

RESPONSIBILITY: Barry Bishop, Operations team.

DATE DUE: 01/29/97

DATE CLOSED:

STATUS: Open

11/21/96 - New Issue

01/09/97 - Will be handled by 9-1-1 meeting on 01/29/97. See operation

team notes from 01/07/97 meeting.

02/13/97 - Still under the Operations committee. Open an issue with

Barry .

03/11/97 - referred to the 911 Adhoc team.

------------------------------------------------------------

ISSUE #:017

DATE OPENED: 11/21/96

DESCRIPTION: Tough scenario: 911 arrangement with Ameritech, but ported

number is in a Sprint-Centel serving area. Will have to do

router-to-router (tandem-to-tandem) routing of traffic.

RESPONSIBILITY: Nancy DeRoo, AIT and Andy Chalk, Sprint-Centel.

DATE DUE: 02/11/97

DATE CLOSED: 03/11/97

STATUS: CLOSED

11/21/96 - New Item

01/09/97 - Nancy DeRoo is still working the issue. Due date changed to

02/11/97.

02/13/97 - Sprint-Centel states this is under standard interconnection

agreements to build router trunks to the Sprint routers. If Ameritech

wants to interconnect to Sprint-Centel, they should enter into an

agreement. I will take to Nancy for full closure.

03/11/97 - closed

------------------------------------------------------------

ISSUE #:018

DATE OPENED: 11/21/96

DESCRIPTION: Need an ANI failure test case for E911. 911 router will

look up default ESN per incoming trunk group.

RESPONSIBILITY: Nancy DeRoo, AIT

DATE DUE: 01/15/97

DATE CLOSED:

STATUS: Open

11/21/96 - New Item

01/09/97 - Nancy DeRoo is still working the issue. Due date changed to

01/15/97.

02/13/97 - Nancy gave to Walt Subora for inclusion in test plan. Walt

will send to Bill. Also, Rick, I-NENA, stated that this needs to be

tested as each new switch is turned up.

03/11/97 - Walt working to get in proper format.

------------------------------------------------------------

ISSUE #:022

DATE OPENED: 10/18/96

DESCRIPTION: Need to determine final test schedule for inter-company

test.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 02/11/97

DATE CLOSED: 03/11/97

STATUS: CLOSED

10/18/96 - New Item

01/09/97 - Still working the issues with Lockheed, but still on track to

start inter-company test on 06/15/97.

02/13/97 - New dates are 07/24/97 to start.

03/11/97 - closed

------------------------------------------------------------

ISSUE #:024

DATE OPENED: 12/06/96

DESCRIPTION: Test team needs to determine failure scenario testing. IITP

tests will use a lab environment to run a broad range of failure

scenarios. How would this complement our efforts.

RESPONSIBILITY: : Team

DATE DUE: 02/11/97

DATE CLOSED:

STATUS: Open

12/06/96 - Walt will put on agenda for Dec. 11 meeting.

01/09/97 - Looping tests will be added to this section. Need to

investigate other scripts. Will see what NIIF (old IITP) can do that

will give confidence in June/July time frame.

03/11/97 - Joint meeting with SCP team on 04/08. Will try to cover

during this meeting.

------------------------------------------------------------

ISSUE #:025

DATE OPENED: 12/06/96

DESCRIPTION: LEC-to-LEC interface tests are still not covered.

RESPONSIBILITY: All

DATE DUE: 02/13/97

DATE CLOSED:

STATUS: Open

12/06/95 - New item. Needs to have EDI interface firmed up

electronically. Also need tests for LEC to LEC interfaces when not EDI.

01/09/97 - To be provided by Operations team. Bill, MCI, will put

generic scripts in for the issue 1. Will be updated in next issue.

02/13/97 - Still open in Operations committee. These are pre-requisite

tests.

------------------------------------------------------------

ISSUE #:026

DATE OPENED: 12/06/96

DESCRIPTION: Test scripts are needed for porting process flows.

RESPONSIBILITY: All

DATE DUE: ??

DATE CLOSED:

STATUS: Open

12/06/96 - Depends on getting better descriptions of the

process flows that will be used. Will definitely test whatever the

final flows are. Operations team has these flows in Flux right now.

12/11/96 - Bill Belshaw, MCI, added cases for operations. They are

generic. Will update when flows are firm.

01/09/97 - To be provided by Operations team. Will be updated in next

issue.

03/11/97 - changed to be "Porting process flows".

------------------------------------------------------------

ISSUE #:028

DATE OPENED: 12/11/96

DESCRIPTION: Need test cases for post dial delay tests.

RESPONSIBILITY: All

DATE DUE: 02/11/97

DATE CLOSED:

STATUS: Open

12/11/96 - Important to do something for post-dial delay, but this is a

very complex subject. It may be cause unnecessary confusion if the job

isn't done right. Will be discussed for issue 2.

01/09/97 - no update.

02/13/97 - Need to come up with a methodology for testing this for the

end user as well as for each of the test types, such as Operator

Services and TR1188 CNAM piece parts (measurements on each of the

queries, etc.). Ensure the call meets handoff criteria, etc.

03/11/97 - Metrics to be handled by SPoC subteam.

------------------------------------------------------------

ISSUE #:029

DATE OPENED: 12/11/96

DESCRIPTION: Need test cases for LSMS section.

RESPONSIBILITY: All

DATE DUE: 03/11/97

DATE CLOSED:

STATUS: Open

12/11/96 - Needs to be covered in that area, too. FCC requires overall

characterization of all tests that have been done.

01/09/97 - No update.

02/13/97 - This is under the NPAC interface testing area. Bettie Shelby,

Worldcom, and Walt Subora, AIT, will write this section in generic terms

as to functionality s that might be needed outside of the NPAC interface

testing. Due date changed to 03/11/97.

03/11/97 - Walt to send to Bill what he and Bettie Shelby have come up

with.

------------------------------------------------------------

ISSUE #:030

DATE OPENED: 12/11/96

DESCRIPTION: The SCP Subcommittee submitted a request for this group to

cover SCCP looping as part of the test plan.

RESPONSIBILITY: All

DATE DUE: 02/11/97

DATE CLOSED:

STATUS: Open

12/11/96 - Discussion on how to do this and for what scenarios. See

notes from Dec. 11 meeting. Need to get input from SCP team on schemes

to prevent/detect looping and how to implement for test purposes. Walt

will send out when available.

01/09/97 - Walt will try to include in January for issue 2 updates.

02/13/97 - Walt to take back to SCP committee for confirmation of what

they want included in test plan and when it will be available.

03/11/97 - Will try to cover in the joint SCP/Test team meeting on April

08, 1997.

------------------------------------------------------------

ISSUE #:032

DATE OPENED: 12/11/96

DESCRIPTION: Need to get a list of the NXXs and DNs for each company

that will be used for the inter-company test.

RESPONSIBILITY: All

DATE DUE: 01/07/97

DATE CLOSED:

STATUS: Open

12/11/96 - Need to get a list of the NXXs and DNs for each company. Send

them to Walt prior to January meeting. Minimum number of DNs per company

has not been decided. Crucially important to define clearly which NXXs

and DNs will be used, and to assure that only agreed-upon NXXs and DNs

are in the setup.

01/09/97 - NPA-NXXs were given by AT&T, AIT, MFS, and MCI at meeting

today. Need the info from TCG and Sprint. Also, need the LRNs and DPCs

for switches, actual DNs to be used, etc. Needed for the Feb. meeting.

02/13/97 - Walt will send out the Rate District list and it will be used

for input on the 02/27 conf. Call.

02/24/97 - Walt still does not have rate district list or proposed

offices.

03/11/97 - NXXs were submitted today and DNs will be on 3/21.

------------------------------------------------------------

ISSUE #:033

DATE OPENED: 01/08/97

DESCRIPTION: Barry to take back to switch requirements team to add

requirement to have the switches mark the ported out numbers as ported

out, not vacant. This could affect the 911 databases if this number is

reassigned by the owner SP after ported out to another SP.

RESPONSIBILITY: Barry Bishop, Operations team

DATE DUE: 02/11/97

DATE CLOSED: 03/11/97

STATUS: CLOSED

01/09/97 - New item.

02/13/97 - It is up to each SP to ensure they do not reassign a ported

number within their own network.

03/11/97 - closed

------------------------------------------------------------

ISSUE #:034

DATE OPENED: 01/08/97

DESCRIPTION: Put picture reference in for each test case. And if no

picture available, draw new one. Submit to Mr. Bill by close of business

on Jan. 15, 1997. Policy is to submit reference or draw new picture when

submit test cases.

RESPONSIBILITY: ALL

DATE DUE: 01/15/97

DATE CLOSED:

STATUS: Open

01/09/97 - New item.

02/13/97 - Still waiting for some of the drawings (Mack Dobkins - ISDN,

Andy Chalk - non-conforming end office, Nancy DeRoo - 911).

03/11/97 - Walt has been able to convert Nancy DeRoo s 911 drawings and

will send them to Bill.

------------------------------------------------------------

ISSUE #:037

DATE OPENED: 01/08/97

DESCRIPTION: Question: Some SPs do not want to do GTTs for open NPA-NXXs

unless they actually port numbers from the NPA-NXXs. There was much

discussion. This is given to the Operations team for

resolution/guidelines.

RESPONSIBILITY: Barry Bishop, Operation team

DATE DUE: 02/11/97

DATE CLOSED: 03/17/97

STATUS: Closed

01/09/97 - New item.

02/13/97 - Walt will open with Barry for Operations team to consider.

03/11/97 - Walt has asked the Operations team for an update.

03/17/97 - Per Barry Bishop, this has been withdrawn by Sprint as an

issue. Closed.

------------------------------------------------------------

ISSUE #:038

DATE OPENED: 01/08/97

DESCRIPTION: Question about later comers - how late can they start.

Suggested must be completed by 6-15 or would have to wait until 7-4.

Still under consideration. Barry and Donna will take back to the

Operations committee.

RESPONSIBILITY: Barry Bishop, Operation team

DATE DUE: 02/11/97

DATE CLOSED:

STATUS: Open

01/09/97 - New item.

02/13/97 - There was another slip in NPAC schedule. The test bed new

date needs to be provided by NPAC. This issue is related to issue #8.

03/11/97 - Much discussion on this. As they NPAC testing schedule will

be adhered to by WorldCom, it was decided to let them start on/about

Aug. 15 and include tests for bringing up a new SP on line. Other SPs

that have not been able to start by now are not part of the Illinois FCC

Field Test.

------------------------------------------------------------

ISSUE #:039

DATE OPENED: 01/08/97

DESCRIPTION: Need PSAPs by office for inter-company test.

RESPONSIBILITY: Nancy DeRoo, AIT, INENA

DATE DUE: 02/11/97

DATE CLOSED:

STATUS: Open

01/09/97 - New item.

02/13/97 - Rick Jones, want to do actual tests when NXXs are known. Also

to target PSAPs for testing when porting numbers.

03/11/97 - As the NXXs are now known, Bob Bartenstein, AIT SPoC, will

pursue with Nancy DeRoo for the PSAPs and their offices.

------------------------------------------------------------

Issue #:040

DATE OPENED: 02/13/97

DESCRIPTION: Walt to get out Rate District list to each SP.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 02/20/97

DATE CLOSED: 03/11/97

STATUS: CLOSED

02/13/97 - New item.

02/24/97 - Walt still does not have rate district list or proposed

offices.

03/11/97 - As the NPA/NXXs have been worked out as well as the rate

Districts for the Field Trial, this is now a mute point. Closed

------------------------------------------------------------

Issue #:041

DATE OPENED: 02/13/97

DESCRIPTION: Each SP to look at rate district list to see if we can come

up with a better coverage map for the inter-company test..

RESPONSIBILITY: ALL

DATE DUE: 03/11/97

DATE CLOSED:

STATUS: Open

02/13/97 - New item.

03/11/97 - This is on the Conf. Call agenda for Mar. 21. We will close

after the call is all is available.

------------------------------------------------------------

Issue #:042

DATE OPENED: 02/13/97

DESCRIPTION: Need to put together inter-company trunking arrangements

for the test scenarios.

RESPONSIBILITY: ALL

DATE DUE: 03/11/97

DATE CLOSED:

STATUS: Open

02/13/97 - New item.

Andy Chalk asked if AIT would allow routing through our tandem to

another SP, if direct trunks cannot be put into place for the

inter-company test time frame?

03/11/97 - Will work aggressively during the April meetings. SPs should

come with Office CLLIs, Point Codes (STPs, SSPs, SCPs?), Trunk Groups

already in place, Tandem s that are interconnected, etc.

------------------------------------------------------------

Issue #:043

DATE OPENED: 03/11/97

DESCRIPTION: WorldCom needs to confirm 08/15 start date.

RESPONSIBILITY: Betty Shelby and Dick Anderson

DATE DUE: 04/09/97

DATE CLOSED:

STATUS: Open

03/11/97 - New Issue.

------------------------------------------------------------

ICC Adhoc Test Committee Closed Action Items:

Dated 02/13/97

ISSUE #: 002

DATE OPENED: 07/16/96

DESCRIPTION: Do we need to incorporate code sharing?

RESPONSIBILITY: Walt Subora, AIT

DUE DATE: 01/09/97

DATE CLOSED: 01/09/97

STATUS: CLOSED

07/16/96 - New Item

01/09/97 - Not different than we do today. Closed.

------------------------------------------------------------

ISSUE #:003

DATE OPENED: 07/16/96

DESCRIPTION: Need documents on web

RESPONSIBILITY: Walt Subora and Barry Bishop, AIT and Bill Belshaw, MCI

DATE DUE: 11/15/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

07/16/96 - New Item

09/17/96 - www.cameos.com/lnp MCI s website for current test plan.

10/18/96 - Barry Bishop's web site is www.ported.com. These notes will

be posted there in Word6 format. Open question whether the draft test

plan can reside there.

01/09/97 - See above. Documents on the Web. CLOSED.

------------------------------------------------------------

ISSUE #:004

DATE OPENED: 07/16/96

DESCRIPTION: Need input from NPAC team for section 2.

RESPONSIBILITY: Steve Markowski, Lockheed

DATE DUE: 01/27/97

DATE CLOSED: 02/13/97

STATUS: Closed

07/16/96 - New Item

01/09/97 - Received information from Lockheed for the NPAC as a summary

for section 4. We need names, telephone numbers, etc. for the contact

list in Section 2 as well as the Turnup Test Plan to put in the addendum

for reference. Steve will get to us the Section 2 info by next meeting

and the test plan when it is final.

02/13/97 - Closed

------------------------------------------------------------

ISSUE #:005

DATE OPENED: 07/16/96

DESCRIPTION: What is process for issues identification and resolution?

Could we use the web pages for input and status?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 02/11/97

DATE CLOSED: 02/13/97

STATUS: Closed

07/16/96 - New Item

01/09/97 - Put into words in the issue 1 test plan and change after

issue 1 is final and process is provided.

02/13/97 - Closed.

------------------------------------------------------------

ISSUE #:006

DATE OPENED: 08/26/96

DESCRIPTION: Need the NPAC committee to determine the test schedule and

provide for inclusion in our test plan.

RESPONSIBILITY: Steve Markowski, Lockheed

DATE DUE: 01/06/97

DATE CLOSED: 02/13/97

STATUS: Closed

08/26/96 - New Item

09/17/96 - Walt has done this. A meeting is scheduled on Oct.02, 1996

with NPAC about testing. The schedule, assumptions and terms are

attached to the Sep 17, 1996 notes. (Attachment 2 of that output)

11/21/96 - NPAC overall schedule was presented by Walt Subora from NPAC

committee output. Still need to determine affect on our test interval.

See notes from Nov. 21 meeting.

12/11/96 - Lockheed provided an overview of a schedule, with three

locations, that brought only certified carriers and live data into the

NPAC after May 05, 1997. This would indeed allow for a start in June as

test data would not be flowing into live LSMSs and SCPs. See notes from

Dec. 11 meeting.

01/09/97 - Steve and Donna Navickas provided new dates which still

provide for the start of inter-company testing on 06/15/97. Will keep

open until final schedule is put together.

02/13/97 - Closed. Will manage now as part of the overall test schedule.

------------------------------------------------------------

ISSUE #:007

DATE OPENED: 09/17/96

DESCRIPTION: Do we want to test conversion from interim portability to

true LRN portability?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 01/06/97

DATE CLOSED: 01/09/97

STATUS: Open

09/17/96 - New Item. Tabled for the present as a future issue.

01/09/97 - This should be handled in inter-company interconnection

agreements and not part of this test plan.

02/13/97 - Operations committee has not come to consensus on this issue.

Still open.

------------------------------------------------------------

ISSUE #:009

DATE OPENED: 10/18/96

DESCRIPTION: AT&T will provide drafts of IXC and LSP sections under 4.5

by 10/28 to allow review time before 11/4 conference call. It will be

somewhat compacted in relation to the plan reviewed today.

RESPONSIBILITY: Mitch Fuchs and OC Jackson, AT&T

DATE DUE: 11/04/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New Item

01/09/97 - The submission was accepted in December. Need drawing

references. See AI#034.

------------------------------------------------------------

ISSUE #:009a

DATE OPENED: 11/04/96

DESCRIPTION: Need coverage matrices for AT&T provided sections

RESPONSIBILITY: Mitch Fuchs and OC Jackson, AT&T

DATE DUE: 11/14/96

DATE CLOSED:

STATUS: CLOSED

11/04/96 - Mitch will produce a coverage matrix for local & intra-LATA

calls. OC. will produce a coverage matrix for inter-LATA calls. Edits

from Mitch Fuchs and OC Jackson to Bill Belshaw by start of day on

11/14, for discussion at 11/21 meeting.

01/09/97 - The submission was accepted in December. Need drawing

references. See AI#034.

------------------------------------------------------------

ISSUE #:010

DATE OPENED: 10/18/96

DESCRIPTION: - Walt requests draft test plan contributions in Word 6.0

format on floppy disk, direct to Bill and direct to Walt for Issue 01 of

document.

RESPONSIBILITY: ALL

DATE DUE: 11/14/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New Item

11/21/96 - Sections were sent to Walt and Bill. Will be included in

December review of document.

01/09/97 - Changes and new scripts were submitted. Included in test

plan. Need drawing references. See AI #034.

------------------------------------------------------------

ISSUE #:011

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for section 4.13 Code Gapping.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 11/04/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New Item

01/09/97 - Scripts were submitted and accepted in December. Need drawing

references. See AI #034.

------------------------------------------------------------

ISSUE #:013

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.8 Operator & Coin.

RESPONSIBILITY: OC Jackson, AT&T and Carmen Colella, AIT

DATE DUE: 12/11/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New Item

11/21/96 - Mitch Bilder, AT&T has a section for Operator and Coin test

cases. Needs to be reviewed. Has much to do with IXC Operator Calls.

Will be delivered to AIT by Ralph Brown, AT&T. Walt will include it on

www.ported.com.

11/21/96 - Carmen Colella, AIT gave a presentation on Operator test

cases needed for local Operators. He will flesh out required cases and

work with Ed Hendrix, BellSouth and Mitch Bilder, AT&T to update this

section.

12/06/96 - Carmen is assembling a matrix of orig. number, called number,

billing number for review at meeting. Bill offers to add it to the

matrix section of the test plan.

12/11/96 - Handout from Carmen Colella, AIT. Asking for tests from

every network that will use the Ameritech LIDB. Since a collect or

third-party-billed call can come from anywhere, the LIDB queries will go

to and from all possible networks. This leads to national compatibility

issues.

Carmen suggested a separate committee for testing of operator services.

There was a requirements OS subgroup. They would be a logical place to

start to constitute such a committee. Barry will check with operations

team to get some names. Could include SMEs from other than the direct

participants on this committee.

01/09/97 - The submission by AT&T is accepted as the Operator Services

section 4.8. Carmen is working on total list of tests for the addendum.

Carmen will hold a meeting with appropriate SMEs from other companies to

determine over all Operator Services test schedule, especially,

validation queries. New item for this. CLOSED.

------------------------------------------------------------

ISSUE #:014

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.6.3 Voice Mail.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 11/21/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New Item

01/09/97 - Scripts submitted in December and accepted. Need drawing

references. See AI #034.

------------------------------------------------------------

ISSUE #:016

DATE OPENED: 11/21/96

DESCRIPTION: Need callbacks from 911 bureaus in the test plan. Need to

add a return call to each test case.

RESPONSIBILITY: Mitch Fuchs, AT&T

DATE DUE: 12/11/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

11/21/96 - New Item

01/09/97 - Mitch Fuchs submitted updated scripts in December. Still need

drawings references. Se AI #034.

------------------------------------------------------------

ISSUE #:019

DATE OPENED: 11/21/96

DESCRIPTION: Need the Operator Services schedule for V.O. software and

IWS positions from Ameritech.

RESPONSIBILITY: Carmen Colella, AIT

DATE DUE: 01/06/97

DATE CLOSED: 02/13/97

STATUS: Closed

11/21/96 - New Item

01/09/97 - Official VO date is 07/19/97. NORTEL still working out which

office is the VO site. Ameritech still believes this will be in MSA-1.

02/13/97 - Nortel will have software in Wabash July 17 and Willowcrest

July 30. Closed.

------------------------------------------------------------

ISSUE #:020

DATE OPENED: 11/21/96

DESCRIPTION: What is the availability requirement on backup NPAC?? How

soon would it have to come on-line after a primary NPAC failure.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 02/11/97

DATE CLOSED: 02/13/97

STATUS: Closed

11/21/96 - New Item. Walt will take to the NPAC committee.

01/09/97 - Steve, Lockheed, stated that there are no scheduled switches

between primary and backup except for software updates. He stated that

primary and secondary are always active and switch is basically from

LSMS to NPAC re-homing of links and not NPAC actual switch. Stated that

Re-sync back is not trivial. Barry suggested that some type of yearly

switch for assurance purposes may be needed. Steve to address. New due

date of 02/11/97.

02/13/97 - Steve Markowski, Lockheed, stated that a routine schedule

will be established for backup and recovery testing. It will be tested

in initial deployment and when Software Upgrade 2 comes in October.

Schedule will be established later, but will be based upon Software

upgrades, etc. Closed.

------------------------------------------------------------

ISSUE #:021

DATE OPENED: 10/18/96

DESCRIPTION: Need to determine test schedule for inter-company test.

Operations team needs by Dec. 01.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 12/01/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

10/18/96 - New item.

11/21/96 - Came to preliminary consensus that testing could be done

after the NPAC finished, starting Jul. 01, 1997 and finishing by Aug.

15, 1997 with straggler testing/fixes after that. Will give to

Operations team. Need to confirm schedule with them and NPAC committee.

01/07/97 - Test schedule was determined and submitted to Operations

committee. See notes from November and December test team meetings.

------------------------------------------------------------

ISSUE #:023

DATE OPENED: 11/04/96

DESCRIPTION: Test team needs to come up with a definition and job

description for inter-company test coordinator to ensure all parts of

the implementation come together, including the NPAC piece.

RESPONSIBILITY: : Walt Subora, AIT and Bill Belshaw, MCI

DATE DUE: 12/01/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

11/04/96 - Bill suggested that Barry Bishop, Operations Chair, send an

e-mail to Dick Dowd s, MCI, boss and ask if Dick could write the

description as he performed the job for the New York Portability trial.

Barry said he would.

11/21/96 - Barry has sent the E-mail. Waiting for Dick to respond.

12/06/96 - Dick Dowd, MCI, responded with a job description and

volunteered to be the coordinator. Barry Bishop will take back to the

Steering Committee for discussion and approval. AT&T had also

volunteered to be coordinator.

12/11/96 - Barry stated that the Steering Committee had agreed and

accepted Dick Dowd, MCI, as the inter-company test coordinator. The test

team unanimously agreed.

01/09/97 - Dick Dowd is the test coordinator. CLOSED.

------------------------------------------------------------

ISSUE #:027

DATE OPENED: 12/11/96

DESCRIPTION: Need test scripts for Section 4.5.8 AIN interactions with

LNP.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 12/24/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

12/11/96 - New Item

12/23/96 - AIN test scripts shipped to Bill on Diskette.

01/09/97 - Accepted. Need drawing references. See AI #034.

------------------------------------------------------------

ISSUE #:031

DATE OPENED: 12/11/96

DESCRIPTION: Need each test plan writer reference the appropriate

figures in Appendix A for each test case.

RESPONSIBILITY: All

DATE DUE: 12/24/96

DATE CLOSED: 01/09/97

STATUS: CLOSED

12/11/96 - Due with the updates to the test scripts for issue 1.

01/09/97 - References and new drawings were submitted to Bill for some

of the areas. Still need from others. Will be tracked by AI #034.

------------------------------------------------------------

ISSUE #:035

DATE OPENED: 01/08/97

DESCRIPTION: Need some kind of on-going switch over testing from NPAC

for switch to backup NPAC. Will do a scheduled outage during switch

software upgrades, etc. (phase 2)

RESPONSIBILITY: Steve Markowski, Lockheed

DATE DUE: 02/28/97

DATE CLOSED: 02/13/97

STATUS: Closed

01/09/97 - New item.

02/13/97 - This is redundant with Item 20. Closed.

------------------------------------------------------------

ISSUE #:036

DATE OPENED: 01/08/97

DESCRIPTION: DeRoo question - can the number in the switch give

indication that the number is ported. Answer - Only EWSD has this

capability now. Will not be used. Barry will check into the possibility

of other vendors giving the capability.

RESPONSIBILITY: Barry Bishop, Operation team

DATE DUE: 02/11/97

DATE CLOSED: 02/13/97

STATUS: Closed

01/09/97 - New item.

02/13/97 - Closed as redundant with item 33.

------------------------------------------------------------