From: /G=WALTER/S=SUBORA/P=AMRTCH1/A=MCI/C=US/@x400gw.ameritech.com

All,

These are the action items I garnered out of each of the test team meetings we

have held. Please look them over. If they are not correct or if I have misstated

any of them, please send a correction. If you have others that I have missed,

please send to me. If you have resolutions for some of these then send to me. We

will be talking about these at the January 8 & 9 meeting. Hopefully, I will send

out an agenda before end of this week.

Walt


Illinois Commerce Commission

Adhoc Test Plan Sub-Committee

Open Issues List

------------------------------------------------------------

ISSUE #:001

DATE OPENED: 07/16/96

DESCRIPTION: Do we need to test NPA splits as part of field test?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 01/06/97

STATUS: Open

07/16/96 - New Item

08/26/96 - Walt Subora to take this to NPAC team and get input on mass

downloads, etc. for test cases.

------------------------------------------------------------

ISSUE #: 002

DATE OPENED: 07/16/96

DESCRIPTION: Do we need to incorporate code sharing?

RESPONSIBILITY: Walt Subora, AIT

DUE DATE: ??

STATUS: Open

07/16/96 - New Item

------------------------------------------------------------

ISSUE #:003

DATE OPENED: 07/16/96

DESCRIPTION: Need documents on web

RESPONSIBILITY: Walt Subora and Barry Bishop, AIT and Bill Belshaw, MCI

DATE DUE: 11/15/96

STATUS: Open

07/16/96 - New Item

09/17/96 - www.cameos.com/lnp MCI s website for current test plan.

10/18/96 - Barry Bishop's web site is www.ported.com. These notes will be posted

there in Word6 format. Open question whether the draft test plan can reside

there.

------------------------------------------------------------

ISSUE #:004

DATE OPENED: 07/16/96

DESCRIPTION: Need input from NPAC team for section 2.

RESPONSIBILITY: Walt Subora and Barry Bishop, AIT

DATE DUE: 01/06/97

STATUS: Open

07/16/96 - New Item

------------------------------------------------------------

ISSUE #:005

DATE OPENED: 07/16/96

DESCRIPTION: What is process for issues identification and resolution? Could we

use the web pages for input and status?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 01/06/97

STATUS: Open

07/16/96 - New Item

------------------------------------------------------------

ISSUE #:006

DATE OPENED: 08/26/96

DESCRIPTION: Need the NPAC committee to determine the test schedule and provide

for inclusion in our test plan.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 01/06/97

STATUS: Open

08/26/96 - New Item

09/17/96 - Walt has done this. A meeting is scheduled on Oct. 02, 1996 with NPAC

about testing. The schedule, assumptions and terms are attached to the Sept. 17,

1996 notes. (Attachment 2 of that output)

11/21/96 - NPAC overall schedule was presented by Walt Subora from NPAC

committee output. Still need to determine affect on our test interval. See notes

from Nov. 21 meeting.

12/11/96 - Lockheed provided an overview of a schedule, with three locations,

that brought only certified carriers and live data into the NPAC after May 05,

1997. This would indeed allow for a start in June as test data would not be

flowing into live LSMSs and SCPs. See notes from Dec. 11 meeting.

------------------------------------------------------------

ISSUE #:006a

DATE OPENED: 08/26/96

DESCRIPTION: Want to include the NPAC test plan as an appendix to this test

plan.

RESPONSIBILITY: Barry Bishop, Operations Team will contact Donna Navickas, NPAC

team

DATE DUE: 01/06/97

STATUS: Open

08/26/96 - New Item

08/30/96 - Walt Subora and Barry Bishop will be meeting with the NPAC team on

Sept. 10 and/or 11 to talk about testing, schedules, etc. Will bring back to

this team.

12/11/96 - Discussion of how NPAC would be incorporated.

Most NPAC test plans are currently proprietary. Since they can't be

incorporated in the public test plan, a characterization of the coverage is

necessary in the master test plan, to show that it has been covered. Sect 4.2.4

of test plan will have a matrix or summary which characterizes the coverage.

Then, at the conclusion of testing, Lockheed would have to provide documentation

of the test results.

------------------------------------------------------------

ISSUE #:007

DATE OPENED: 09/17/96

DESCRIPTION: Do we want to test conversion from interim portability to true LRN

portability?

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: ??

STATUS: Open

09/17/96 - New Item. Tabled for the present as a future issue.

------------------------------------------------------------

ISSUE #:008

DATE OPENED: 09/17/96

DESCRIPTION: What is the definition of qualification tests for a newcomer SP

(Service Provider)?

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

09/17/96 - New Issue

------------------------------------------------------------

ISSUE #:009

DATE OPENED: 10/18/96

DESCRIPTION: AT&T will provide drafts of IXC and LSP sections under 4.5 by 10/28

to allow review time before 11/4 conference call. It will be somewhat compacted

in relation to the plan reviewed today.

RESPONSIBILITY: Mitch Fuchs and OC Jackson, AT&T

DATE DUE: 11/04/96

STATUS: Open

10/18/96 - New Item

------------------------------------------------------------

ISSUE #:009a

DATE OPENED: 11/04/96

DESCRIPTION: Need coverage matrices for AT&T provided sections

RESPONSIBILITY: Mitch Fuchs and OC Jackson, AT&T

DATE DUE: 11/14/96

STATUS: Provisional Closed

11/04/96 - Mitch will produce a coverage matrix for local & intra-LATA calls.

OC. will produce a coverage matrix for inter-LATA calls. Edits from Mitch Fuchs

and OC Jackson to Bill Bellshaw by start of day on 11/14, for discussion at

11/21 meeting.

------------------------------------------------------------

ISSUE #:010

DATE OPENED: 10/18/96

DESCRIPTION: - Walt requests draft test plan contributions in Word 6.0 format on

floppy disk, direct to Bill and direct to Walt for Issue 01 of document.

RESPONSIBILITY: ALL

DATE DUE: 11/14/96

STATUS: Closed

10/18/96 - New Item

11/21/96 - Sections were sent to Walt and Bill. Will be included in December

review of document.

------------------------------------------------------------

ISSUE #:011

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for section 4.13 Code Gapping.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 11/04/96

STATUS: Open

10/18/96 - New Item

------------------------------------------------------------

ISSUE #:012

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.14 Choke Networks.

RESPONSIBILITY: Barry Bishop, AIT

DATE DUE: 11/04/96

STATUS: Open

10/18/96 - New Item

------------------------------------------------------------

ISSUE #:013

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.8 Operator & Coin.

RESPONSIBILITY: OC Jackson, AT&T and Carmen Colella, AIT

DATE DUE: 12/11/96

STATUS: Open

10/18/96 - New Item

11/21/96 - Mitch Fuchs has a section for Operator and Coin test cases. Needs to

be reviewed. Has much to do with IXC Operator Calls. Will be delivered to AIT by

Ralph Brown, AT&T. Walt will include it on www.ported.com.

11/21/96 - Carmen Colella, AIT gave a presentation on Operator test cases needed

for local Operators. He will flesh out required cases and work with Ed Hendrix,

BellSouth and Mitch Fuchs, AT&T to update this section.

12/06/96 - Carmen is assembling a matrix of orig. number, called number, billing

number for review at meeting. Bill offers to add it to the matrix section of

the test plan.

12/11/96 - Handout from Carmen Colella, AIT. Asking for tests from every

network that will use the Ameritech LIDB. Since a collect or third-party-billed

call can come from anywhere, the LIDB queries will go to and from all possible

networks. This leads to national compatibility issues.

Carmen suggested a separate committee for testing of operator services. There

was a requirements OS subgroup. They would be a logical place to start to

constitute such a committee. Barry will check with operations team to get some

names. Could include SMEs from other than the direct participants on this

committee.

------------------------------------------------------------

ISSUE #:014

DATE OPENED: 10/18/96

DESCRIPTION: Need test scripts for Section 4.6.3 Voice Mail.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 11/21/96

STATUS: Open

10/18/96 - New Item

------------------------------------------------------------

ISSUE #:015

DATE OPENED: 11/21/96

DESCRIPTION: How will calls from police agencies be referred to the correct

telco.

RESPONSIBILITY: Barry Bishop, Operations team.

DATE DUE: ??

STATUS: Open

11/21/96 - New Issue

------------------------------------------------------------

ISSUE #:016

DATE OPENED: 11/21/96

DESCRIPTION: Need callbacks from 911 bureaus in the test plan. Need to add a

return call to each test case.

RESPONSIBILITY: Mitch Fuchs, AT&T

DATE DUE: 12/11/96

STATUS: Open

11/21/96 - New Item

------------------------------------------------------------

ISSUE #:017

DATE OPENED: 11/21/96

DESCRIPTION: Tough scenario: 911 arrangement with Ameritech, but ported number

is in a Sprint-Centel serving area. Will have to do router-to-router

(tandem-to-tandem) routing of traffic.

RESPONSIBILITY: Nancy DeRoo, AIT and Andy Chalk, Sprint-Centel.

DATE DUE: 01/06/97

STATUS: Open

11/21/96 - New Item

------------------------------------------------------------

ISSUE #:018

DATE OPENED: 11/21/96

DESCRIPTION: Need an ANI failure test case for E911. 911 router will look up

default ESN per incoming trunk group.

RESPONSIBILITY: Nancy DeRoo, AIT

DATE DUE: 01/06/97

STATUS: Open

11/21/96 - New Item

------------------------------------------------------------

ISSUE #:019

DATE OPENED: 11/21/96

DESCRIPTION: Need the Operator Services schedule for V.O. software and IWS

positions from Ameritech.

RESPONSIBILITY: Carmen Colella, AIT

DATE DUE: 01/06/97

STATUS: Open

11/21/96 - New Item

------------------------------------------------------------

ISSUE #:020

DATE OPENED: 11/21/96

DESCRIPTION: What is the availability requirement on backup NPAC?? How soon

would it have to come on-line after a primary NPAC failure.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 01/06/97

STATUS: Open

11/21/96 - New Item. Walt will take to the NPAC committee.

------------------------------------------------------------

ISSUE #:021

DATE OPENED: 10/18/96

DESCRIPTION: Need to determine test schedule for inter-company test. Operations

team needs by Dec. 01.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 12/01/96

STATUS: Open

10/18/96 - New item.

11/21/96 - Came to preliminary consensus that testing could be done after the

NPAC finished, starting Jul. 01, 1997 and finishing by Aug. 15, 1997 with

straggler testing/fixes after that. Will give to Operations team. Need to

confirm schedule with them and NPAC committee.

------------------------------------------------------------

ISSUE #:022

DATE OPENED: 10/18/96

DESCRIPTION: Need to determine test schedule for inter-company test. Operations

team needs by Dec. 01.

RESPONSIBILITY: : Walt Subora, AIT and Donna Navickas, NPAC chair

DATE DUE: 12/01/96

STATUS: Open

10/18/96 - New Item

------------------------------------------------------------

ISSUE #:023

DATE OPENED: 11/04/96

DESCRIPTION: Test team needs to come up with a definition and job description

for inter-company test coordinator to ensure all parts of the implementation

come together, including the NPAC piece.

RESPONSIBILITY: : Walt Subora, AIT and Bill Belshaw, MCI

DATE DUE: 12/01/96

STATUS: Provisional Closed

11/04/96 - Bill suggested that Barry Bishop, Operations Chair, send an E-Mail to

Dick Dowd s, MCI, boss and ask if Dick could write the description as he

performed the job for the New York Portability trial. Barry said he would.

11/21/96 - Barry has sent the E-mail. Waiting for Dick to respond.

12/06/96 - Dick Dowd, MCI, responded with a job description and volunteered to

be the coordinator. Barry Bishop will take back to the Steering Committee for

discussion and approval. AT&T had also volunteered to be coordinator.

12/11/96 - Barry stated that the Steering Committee had agreed and accepted Dick

Dowd, MCI, as the inter-company test coordinator. The test team unanimously

agreed.

------------------------------------------------------------

ISSUE #:024

DATE OPENED: 12/06/96

DESCRIPTION: Test team needs to determine failure scenario testing. IITP tests

will use a lab environment to run a broad range of failure scenarios. How would

this complement our efforts.

RESPONSIBILITY: : Team

DATE DUE: ??

STATUS: Open

12/06/96 - Walt will put on agenda for Dec. 11 meeting.

------------------------------------------------------------

ISSUE #:025

DATE OPENED: 12/06/96

DESCRIPTION: LEC-to-LEC EDI interface tests are still not covered.

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

12/06/95 - New item. Needs to have EDI interface firmed up electronically. Also

need tests for LEC to LEC interfaces when not EDI.

------------------------------------------------------------

ISSUE #:026

DATE OPENED: 12/06/96

DESCRIPTION: Test scripts are needed for process flows.

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

12/06/96 - Depends on getting better descriptions of the

process flows that will be used. Will definitely test whatever the final flows

are. Operations team has these flows in Flux right now.

12/11/96 - Bill Bellshaw, MCI, added cases for operations. They are generic.

Will update when flows are firm.

------------------------------------------------------------

ISSUE #:027

DATE OPENED: 12/11/96

DESCRIPTION: Need test scripts for Section 4.5.8 AIN interactions with LNP.

RESPONSIBILITY: Walt Subora, AIT

DATE DUE: 12/24/96

STATUS: Provisional Close

12/11/96 - New Item

12/23/96 - AIN test scripts shipped to Bill on Diskette.

------------------------------------------------------------

ISSUE #:028

DATE OPENED: 12/11/96

DESCRIPTION: Need test cases for post dial delay tests.

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

12/11/96 - Important to do something for post-dial delay, but this is a very

complex subject. It may be cause unnecessary confusion if the job isn't done

right. Will be discussed for issue 2.

------------------------------------------------------------

ISSUE #:029

DATE OPENED: 12/11/96

DESCRIPTION: Need test cases for LSMS section.

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

12/11/96 - Needs to be covered in that area, too. FCC requires overall

characterization of all tests that have been done.

------------------------------------------------------------

ISSUE #:030

DATE OPENED: 12/11/96

DESCRIPTION: The SCP Subcommittee submitted a request for this group to cover

SCCP looping as part of the test plan.

RESPONSIBILITY: All

DATE DUE: ??

STATUS: Open

12/11/96 - Discussion on how to do this and for what scenarios. See notes from

Dec. 11 meeting. Need to get input from SCP team on schemes to prevent/detect

looping and how to implement for test purposes. Walt will send out when

available.

------------------------------------------------------------

ISSUE #:031

DATE OPENED: 12/11/96

DESCRIPTION: Need each test plan writer reference the appropriate figures in

Appendix A for each test case.

RESPONSIBILITY: All

DATE DUE: 12/24/96

STATUS: Open

12/11/96 - Due with the updates to the test scripts for issue 1.

------------------------------------------------------------

ISSUE #:032

DATE OPENED: 12/11/96

DESCRIPTION: Need to get a list of the NXXs and DNs for each company that will

be used for the inter-company test.

RESPONSIBILITY: All

DATE DUE: 01/07/97

STATUS: Open

12/11/96 - Need to get a list of the NXXs and DNs for each company. Send them to

Walt prior to January meeting. Minimum number of DNs per company has not been

decided. Crucially important to define clearly which NXXs and DNs will be used,

and to assure that only agreed-upon NXXs and DNs are in the setup.