ICC Operations Meeting Minutes

1/6 - 1/7/97

Team, the following are the minutes of our January Operations meeting as recorded by Lorin Pollock ((Sprint) Thanks Lorin). The Italicized text are my additions from my notes. If there are any additions and/or corrections needed to the minutes, please feel free to contact me (312-220-8000), and I will be glad to add to or reflect any changes necessary.

Barry

In attendance:

Walt Subora Ameritech

Jim Joerger MCI

Bill Belshaw MCI

Dick Dowd MCI

Darin Liston Sprint

Bryon Bentlin Lockheed Martin IMS

Richard Anderson World Com/MFS

Lorin Pollock Sprint

Ed Elkin AT&T

Joan Ahern Bell Atlantic

Alice Shocket NYNEX

Maggie Lee Illuminet

Karen Kay Time Warner

Gene Johnston GTE

Arthur Brett TCG

David Loose Sprint

Tom Sensabaugh Bellcore

Victoria Cerinich CPD/INENA

Sue Seitz Ameritech

Richard Nore Chicago OEC

Jeff Rodrigues Chicago OEC (911)

Rick Jones INENA

Jeff Wells WorldCom

Don Dabney SWBT

Hazel Wagner B9D/Nortel

Mark Lancaster AT&T

Phil Presworsky TCG



LNP MEETING JAN. 6, 1997

PROVISIONING ISSUE DISCUSSION:

Review of changes made to process flows that have been agreed to :

Added "on LSR" to box New Service Provider notes only partial changes of service in remarks.

Remove notes 1 & 2 from Draft 3 of Provisioning Process flow and add to the flow narratives.

What is the designated time referred to in the "Did NPAC receive both and accurate notifications in the designated time?" Original discussion stated 18 hours. Ed of AT&T discussed 9 hours for each box? Agreed to change to 9 hours for each timer decision box and remove question mark.

Victoria Cerinich of Chicago Police bought up adding a box to contact the PSAT administrator when the order is committed to proceed in order to update the ALI data base. Major discussion about who and how the ALI data base is updated with portability. Decided to establish a 911 SME meeting to discuss issues related to the ALI data base.

Two basic issues:

!.) Co ordination of orders to the ALI data base from old and new SP.

2.) Notification of the opening of NPA/NXX to the ALI Administrator and/or PSAP providers needing this information.

A separate ICC Operations/911 meeting will be held:

January 29. 1997

08:30 a.m. - 4:30 p.m.

Rm 463

350 Orleans, Chicago, Ill (this is the Ameritech Training center on the 4th floor of the Holiday Inn building).

For those who cannot attend in person a conference bridge will be available

(312-814-8097). This is a meet-me bridge and will just drop you into the conference. Please note that due to the size of the room, it may be hard to hear on the conference bridge, and you will not be able to receive any handouts or see any drawings on the whiteboard or vu-graph. While this meeting as usual is open to everyone, it is expected that Telco Service Providers and Emergency Service Providers (also PSAP and Database vendors) would be expected to attend. A memo has been previously sent (via fax) with some of the issues from INENA. (BB)




CONFLICT RESOLUTION Process Flow review.

Change box "NPAC reject Conflict request. Send notification to both SPs." to " NPAC rejects Conflict request." deleting "Send notification to both SPs."

Major discussion about time related to decision box "Old SP initiating Conflict less than one day prior to DD?" Conflict cannot be started after 00:01 of the day before the due date, one full day plus hours to the due time on due date. Change decision box to "Old SP initiating conflict later than DD, 00:00 minus 24 Hrs?" Made additional changes to conflict resolution NPAC

CANCELLATION PROCESS FLOW discussion.

Indicate 9 hours for each decision diamond for timing.

Show (C) from conflict chart to WHERE on Cancellation chart' (C) should go to two boxes "Old service provider cancels all orders & sends cancellation to NPAC." & box "New Service provider sends notification of cancellation to NPAC."

Add "if appropriate" to" Old Service Providers cancels all orders & if appropriate, sends cancellation to NPAC." box. Attach a note to the "if appropriate".

Add "if appropriate" to both boxes that bubble (C) points to.

Add "via LSR/FOC" to box "Old Service provider sends notification to New Service Provider"

Add bubble (X) as output from page one of one of PROCESS FLOW CHART CANCELLATION replacing bubble (B). Add bubble (X) as an input to CONFLICT RESOLUTION FLOW CHART replacing bubble (B) input.

Add note: 1.) CANCELLATION REQUEST IS SUPPORTED ONLY IF SP HAS PREVIOUSLY UPLOADED INTO NPAC, OTHERWISE REJECTED. TO THE CANCELLATION PROCESS MAP.

ADD NOTE #1 TO BOXES OLD & NEW SERVICE PROVIDER BOXES. WHERE "IF APPROPRIATE" WAS ADDED.

Add note: 2.) NPAC TESTS FOR CANCEL PENDING RESOLUTION ACKNOWLEDGMENT BASED ON WHICH SPs PREVIOUSLY UPLOADED INTO NPAC. TO THE CANCELLATION PROCESS MAP DECISION FOR DIAMOND "DID NPAC RECEIVE NOTIFICATION(S) IN DESIGNATED TIME?" ADD NOTE #2.

On CANCELLATION ORDER PROCESS FLOW change request form to ASR.

Remove decision diamond on CANCELLATION PROCESS FLOW "Is response positive?"

Remove "cancels all orders &" from box "Old Service Provider cancels all orders & sends cancellation to NPAC.

10 digit trigger discussion. #1. Do all vendors supply in functionally the same manner?

#2. Release date & implementation date?

#3 DMS10 issue?

Each company will contact their vendor to obtain specific information i.e. 5ess what recent change page(s) and fields need to be filled and what the translations guide gives as documentation.

Nortel needs to supply what servord tuples are data filled and tables requiring translations LRN Tables.

Barry will contact NORTEL and Lucent. Jim Joerger will contact Erricson to attend the next meeting with details of translations.

LNP MEETING 1/7/97 DAY TWO

Barry updated process flow charts for review.

Reinstalled "optional" to "Old and New Service Providers notify NPAC of change request after Old"

of PROVISION SERVICE PROCESS FLOW.

Remove timing note at the bottom of the page for the CANCELLATION PROCESS FLOW.

CONFLICT RESOLUTION PROCESS FLOW

Added by old SP to "First time into conflict?" decision diamond.

Phil of TCG gave a report of the events that occurred at the NANC meeting on 1/6/97. Basically, no decision of interim solution for provisioning was agreed to. The only new issue was porting vacant numbers.

Review of PROCESS FLOWS FOR OPENING NPA/NXX FOR PORTING IN AN LNP ENVIRONMENT by Phil of TCG.

MCI questioned the use of the word "feasible" in the second paragraph of the box 1 explanation.

Phil and Jim will work off line to revise verbiage of the second paragraph.

Discussion about the quanity of NPA/NXXs that will be rolled out initially. If every code is opened, there may be Engineering issues of network capacity.

Discussion about "information should be treated as proprietary" on page two explanation of box 1. This may not be for the Operations Committee to determine as a legal issue.

Discussion about an office requested to be opened with none or a few customers ported. Barry suggested that this may be a cost recovery issue that the requesting company should bear the cost of the old service provider's expense.

NEW VERBIAGE FOR BOX 1 EXPLANATION by Phil and Jim.

Within 5 business days of receipt, the originator of the request shall receive a written response that the request was received and will be placed into the next update of the LERG.----to replace the second paragraph on page one.

No mention of whether the request is accurate or if the switch is LNP capable that has the NPA/NXX.

Request should be valid and for offices that are LNP capable. Add verbiage "If the recipient does not own the requested NPA/NXX or if the switch is not LNP capable, this information will be included in the response.

A alternative verbiage was proposed by Karen to replace the first two paragraphs.

Clarification of the asterisk sentence was discussed. Within 45 days of what? GTT completed -45 + 5.

Requests to open NPA/NXX reflect market forecasts of Service Provider. As such the request for code openings shall be treated as proprietary marketing information. Was proposed as a replacement for:

IT IS EXPECTED THAT INFORMATION CONTAINED IN THE LETTER BE USED ONLY FOR UPDATING NETWORK INFORMATION was agreed to.

Discussion of the vehicle for a trigger to activate GTT -- either the LERG or the NPAC notification.

Add to box 3 "This is the start for beginning the GTT translations.

Discussion about which GTT will be programmed -- LNP and other services suchas CLASS, LIDB, Voice Mail. Jim will write up verbiage.

Box 7 NPAC upon receipt of matched porting requests DISCUSSION

Phil to modify verbiage for Box 7 and have to Barry by end of week.

A conference call was scheduled for two hours on 2/3/97. 10:00am EST (312) 814-8097 to review Phil's revisions. (this call will also be used to make sure everyone concurs to the changes which have been made to the documents which reflect the agreements for the "Interim" proposal. A complete set of the drawings will be forwarded (under separate cover) following this document for your review. If there are any obvious errors or mis-representations on the drawings (it is getting hard to keep all the changes straight), please contact me immediately so I can correct them and send them to the participants prior to the conference call.

Also for those participants who have provided verbiage which will go in the document to support the drawings, please verify that the verbiage correctly reflects the changes. I would appreciate it if everyone after checking their verbiage would send me an electronic copy of their verbiage so it can be compiled and forwarded to the team. If possible please send it in a Msword format attachment to an E-mail or E-mail text to barry.bishop@ported.com or via 3.5 floppy to :

Barry Bishop

Ameritech

Flr 15NW

311 W. Washington

Chicago Illinois

60606

If unable to provide the info in this format, please give me a call (312-220-8000) and I am sure we can work something out. If we should have time on this call, I would like to cover as much as possible.

Thanks

Barry Bishop

ICC Operations Chairperson