Subject: 970108.test.team.minutes

Team,

here are the minutes friom the January 08 and 09, 1997 test team meetings. I

will also be sending out the action items., The test status (attachment 1

mentioned) is available on www.ported.com, as will these notes in Word6 format.

Please feel free to get them. The action items will also be available on

www.ported.com.

Remember, we have a conf. call and a meeting coming up:

CC: 01/28/97

09:00 CST

312-814-8097

Mtg: 02/13/97

08:30 to 17:00

350 N. Orleans, Room 437

(Ameritech learning Center at Mart Holiday INN.)

Chicago, IL

I will be sending the agenda out foor the meeting next week, after the

conference call.

Walt

847-248-5418 (ph)

847-248-6746 (fax)

walter.subora@ameritech.com



---------------------------------- Forwarded ----------------------------------

From: BARRY.BISHOP@x400gw.ameritech.com

Autoforwarded: TRUE

Message-Id: <"24313242107991/27613 IN-DECTSAP*"@MHS>

Meetings were held for the ICC ADHOC Inter-company test team on January 8 and 9,

1997. In attendance were:

Bill Belshaw MCI

Barry Bishop Ameritech/ICC Operations Chair

Arthur Brett TCG

Victoria Cernich CPD/INENA

Carmen Colella Ameritech

Nancy DeRoo Ameritech/INENA

Dick Dowd MCI

Bill Ellis Sprint Local

Mitch Fuchs AT&T

John Good Ameritech

Ed Hendrix Bell South

OC Jackson AT&T

Gene Johnston GTE

Rick Jones IBU6/INENA

Steve Markowski Lockheed Martin

Donna Navickas Ameritech/ICC NPAC Chair

Tom Sensabaugh Bellcore

Walt Subora Ameritech/ICC Adhoc Test Team Chair

Allena Wheatley Bell South

ICC Test Committee Meeting - 01/08&09/97

I. OS Testing Issues

A. Carmen gave general information.

1. Some of his concerns:

. Query flow - through various LIDBs etc.

. Timing under 2sec - required

. Needs more contacts - Will get list from Regional contacts next week. Has to

go to TIS for list of names.

. OC asked if there was a dedicated team to do testing for OS? Answer no

. Carmen s test scripts need to be converted to standard format, and 1 test per

page. He s working on them.

Actual OS test scripts used will be ATT s provided scripts. Carmen s scripts

will be incorporated in an addendum for selection as needed for over and above

required tests.

II. Review of Test Sections

Handed out Test Status update list/Matrix. See Attachment 2.

Bill went over sections and noted sections still needing authors. Also pointed

out sections that will be used for FCC submission. He wands us to review those

sections and get back to him with any comments by 1-31-97

Walt asked for comments and volunteers for sections without test scripts.

4.6 Unique Situations

4.6.1 Answering Services

4.6.2 Tones and Announcements

4.7 Cellular & PCS Interconnection

4.9 Failure Scenarios

4.11 Other EO and Tandem

4.11.12 Other Network Interactions

4.11.13 Industry and Standards

4.12 NPA Splits

4.14 Choke Networks

Matrices will be dropped from individual test scripts. Too confusing.

Mitch asked if new drawings needed to be consistent with existing drawing. Bill

said if changes were needed or additions, that s OK. He will incorporate into

what we have and number as needed. However we need to be consistent.

John questioned the need for all 160 test cases for ISDN. After discussion,

Mack will decrease to about 14 as required. Team will review again. Remaining

will be put in addendum for as needed over and above required tests.

AI #34 - put picture reference in for each test case. And if no picture

available, draw new one. Submit to Mr. Bill by close of business on Jan. 15,

1997. Policy is to submit reference or draw new picture when submit test cases.

III. Review 911 Issues

A. Victoria went over the 20 items listed in her handout. (See Attachment 3).

Item

1 & 2 - operations issue

3 - long term direct only

4 - Interim number portability, not an issuer for this team

5 - yes on our intra Co. tests, requirements <2 seconds.

6 - no

7 - to be discussed in Jan 29th operations 911 special meeting

8 - sec 4.5.6 number of Inter Co. tests will be cut down

9, 10, 11 - operations issue

12 - same as 6

13, 14 - operations issue

15 - can t have unannounced test calls coming in, intra or inter Co.

testing

16 - operations issue

17 - 20 - operations issue

B. 911 Test Call Matrix discussion (See attachment 2, page 2)

DeRoo wanted to know who is going to decide what switch a customer will be

ported to. This issue needs to go back to Betty Mickle for answer from

Ameritech s point of view.

Victoria asked if a test call would be made from each office after the software

is loaded. Answer is basically no. Test calls will be made from each switch

type in test towns.

Barry to take back to switch requirements team to add requirement to have the

switches mark the ported out numbers as ported out, not vacant. This could

affect the 911 databases if this number is reassigned by the owner SP after

ported out to another SP. Item #33.

IV. NPAC Testing Scheduling

A. Basic discussion:

Last meeting (12-11-96) Steve Markowski, Lockheed, had presented a staggered

schedule using 3 test systems, starting on March 17, 1997 and ending on June 15,

1997. Since then, several change orders have been indicated to be implemented

before deployment. Thus, testing has now been pushed out to start on April 18,

1997, with simultaneous testing of Service Providers, to complete by June 15,

1997. Thus the start of inter-company test is still scheduled for June 15, 1997.

Dick Dowd, MCI, is the testing coordinator for this test, MSA-1 only, and will

work how any changes to this schedule will impact the over all test schedule.

Steve presented a summary of NPAC testing. See Attachment 3.

AI #35 - Need some kind of on-going switch over testing from NPAC for switch to

backup NPAC. Will do a scheduled outage during switch software upgrades, etc.

(phase 2) - Steve Markowski.

Question about later comers - how late can they start. Suggested must be

completed by 6-15 or would have to wait until 7-4. Still under consideration.

Barry and Donna will take back to the Operations committee. AI #38.

Dowd suggested to put a sign off requirement that intra company testing was

completed for 911 before starting inter company testing. Team agreed to add.

(Section 4.1.2 )

Dick Dowd said that no simulation testing should be allowed when testing starts.

Suggests a statement be put into test plan.

B. NPAC TESTING PHASES

01/04 ---- Interoperability testing

| ---- (based upon ASNI, GDMO, in IIS)

( I ) | ---- DSET

| 1. Stack - to - Stack

04/05 2. GDMO (general defined managed objects)

04/18 ---- Turnup Testing to NPAC

( II ) | 1. APP to APP

| 2. INPFRS LSMS/SOA to NPA

06/15 3. M&P LSMS/SOA to NPAC

06/15 ---- Inter - Service Provider Testing

( III ) |

08/30 ---- End of Test

07/04 ---- Test Bed Available, new SPs

09/01 ---- Available for Live Service

09/30 ---- Report due to the FCC

1. Inter - Service Provider test

V. Misc.

Dowd mentioned a word of caution - people of this team should be going back to

their company to get dedicated personnel, if possible, in order to get this work

done. FCC mandated dates. Comment by Walt - we ( Ameritech ) won t have a

dedicated team for every area, due to work loads etc., but would have people

available when needed on 2 to 3 days notice.

DeRoo question - can the number in the switch give indication that the number is

ported. Answer - Only EWSD has this capability now. Will not be used. Barry

will check into the possibility of other vendors giving the capability. AI #36.

Dowd - Once test configurations are finished a sit down with company experts

will have to be done to prioritize testing.

Barry - Testing AMA he assumes will be written off however we do want actual

billing generated as it normally would be.

Carmen - Concerned about multiple dips for LIDB validation. Example credit card

call from ATT customer could dip at ATT LNP DB, be sent to Ameritech, another

dip by Ameritech for LNP dip, LIDB validation dip, then eventually complete

Bill, Sprint Local, stated that there were three scenarios possible:

1 Ported number dip locally.

2 Bypass send to owner

Owner would send to his local

Owner would send back to sender but with different STP point code

3 NXX marked ported (am I a recipient of any ported numbers)

Yes - local dip

No - send to owner

Discussion of which of these 3 scenarios should be followed when an NPA-NXX is

opened for porting. Sprint Local does not want to, or plan to, perform the GTTs

in their network unless they are actually porting numbers out of that NPA-NXX.

Walt, Ameritech, stated that the whole LTNP functionality is based upon everyone

doing the lookups in their LNP GTT databases or some issues may result, such as

looping, etc. One of the suggestions was: If NXX belongs to a company, hand off

to that CO for LNP dip and validation. If it is ported, then they will handoff

to the porting company. Barry will take this back to the Operations committee

for clarification. AI #37.

VI. Test Timeline Discussion

04/01 - LERG open for input (proposed)

|

05/01 - LERG TEST DATA NPA-NXX - LRN (proposed)

|

| - GTT for CNAM, VOICE MAIL, LIDB, CLASS

| - Start Operator Services validation query calling

| - SCP will have default GTT info

06/01 - input live data for initial test call, pre-LNP

|

06/15 - Start of Inter Company test

| - 5 day port process

| - EDI interface tests. (those that are ready)

| - Call processing / Billing tests. (per company), especially 911/

| Validation queries OS.

| - Provisioning flow (canceled order) process check.

| - call processing test scripts

|

| - Look at disconnect service. Process flow

| - other testing

|

08/15 - First pass of all test scripts

|

08/30 - End of test time, start FCC report

|

09/15 - Deployment

|

09/30 - FCC Report delivered.

Issues to slot in timeline:

- Other Porting

* 3 day process

* Cancel Porting

- NewSP

- OldSP

- Before Deadline

- After Deadline

* Operator Services Handoff

(BLV & Interrupt)

Comment from DeRoo - test canceled order to be sure 911 DB reflects proper info.

Need PSAPs by office - DeRoo, AI #39.

VII. NPA-NXXs for Inter Company test

A. Ameritech:

Joliet Main 815-726

West 815-744

Park Forest 708-481

Barrington So. 847-248 (MFS) 847-756

Stewart 1A 312-994

5E 312-224

B. AT&T:

Elmhurst 630-359

Oak Park 708-934

C. MCI:

Bensenville 708-315

D. Others:

Still need the NPA-NXX data for TCG and Sprint Local by the next meeting

(Conference call 01/27/97).

VIII. Action Item Review:

Reviewed the action items. The updated list is attached (dated 01/20/97).