ICC LNP Operations meeting held on December 17, 1997
Provided below are three sets of minutes from the ICC LNP Operations meeting held on December 17th. Information regarding discussion on the Law Enforcement meeting has been deleted from these meeting minutes. Phone numbers and E-Mail addresses have also been removed.
Appreciation and Thanks goes to the authors of the minutes provided.
NEXT ICC LNP OPERATIONS MEETING
Next Operations meeting will be held on January 21, 1998 with AT&T as host. Location 227 W. Monroe on the 4th floor in the Fargo Room @ 0900 Bridge 312-814-8097.
NOTE: The following minutes are an informal attempt to capture the key information discussed in the meeting. These minutes are not all inclusive and may not cover all information discussed.
The minutes below were provided by Lorin Pollock - Sprint
The detailed information regarding the Law Enforcement meeting has been deleted.
December 17, 1997 ICC LNP Operations Meeting
Going live in Illinois with LNP has been delayed due to Ameritechs’ petition for cost recovery . The FCC mandated date for the top 100 MSAs is 3/31/98.
Michigan’s’ schedule was discussed
Barry Bishop will be retiring from Ameritech at the end of the year and has accepted a position with Lockheed Martin.
There is an opening for Co-chair for the Operations Committee. O. C. Jackson from AT&T volunteered with Robin Meier (Ameritech) as an interim.
Robin (312) 220-2603
O. C. (312) 230-2567
Yesterday’s (12-16-97) meeting with Law Enforcement minutes were discussed..
Next Operations Meeting will be 1/21/98 at the AT&T Bldg 227 West Monroe 4th floor at 9:00am.
Hosted by O. C. Jackson.
Darin Liston (Sprint) distributed information from the OBF on the LSR process related to LNP. Information originated from the South West Region LSR Review meeting held in Little Rock, Arkansas on October 23-24, 1997 which was submitted to the OBF Committee in Dallas, Texas in December.
The last two pages contain OBF recommendations. The information includes flow scenarios for various situations including resellers, multiple service providers, etc. and is for FYI.
Requirements for a new entrance who is NPAC certified for testing with other companies was requested by WorldCom (Denise Thomas). Contacts can be found at "www.ported.com" web site.
Meeting adjourned until 12:45pm for lunch.
Donna Navickas distributed Number Pooling process flow charts dated 12/7/97.
Reviewed Number pooling - Pre-NPAC. Only non-contaminated blocks are involved. Time limitations were discussed. The time from when a request is made by a SP to the Pool Administrator until a block is assigned should be 10 business days with the effective date being established by the recipient SP or no sooner than 3 days (if request is ASAP)????.
Review of Non-contaminated Post NPAC Number Pooling/Pre-Port process flow. (Page 1)
Change box 5 to read "Updates TN inventory in the appropriate TN Tables." Add the NOTE about NXX must be open for porting on the Pre-NPAC process flow (page 5). MCI wants it noted that box 6 is not supported by them as it causes additional work for the Pooling Administrator to distribute the required information to NPAC, Donor and Recipient. The block recipient should be responsible for distribution and have control. The committee noted the opposition and continued discussion.
The time line (page 2) was discussed. Total of 18 days maximum for the first port. Add decision box (page 1) between box six and seven as first port "yes//no" -- if no go from box 6 to 8. Should we delete page 2 timeline? Consensus to delete page 2 timeline.
Contaminated - Post NPAC Requirement Implementation/Pre-port discussion.(page 3). Add note and decision box as on page 1. Note: The effective date will be either 8 days or 3 days prior to the effective date dependent upon whether it is first port or not. 8 days - first port 3 days - not the first port. This should be 3 or 5 days (first port) on the Pre-NPAC. The recipient (requester) of the block should have a limit (outer) for the effective date which should be defined in the Pool Admin. guidelines. Add note for box 4 and delete 2nd half of box 11 "complete EO switch translation work after NPAC download."
Change box 4 "-Intra porting completion date" to "effective date minus 1".
Major discussion about the number of contaminated lines and how does this effect the timeline.
The following minutes were provided by Robin Meier.
12-17-97
NOTE: These minutes are an informal attempt to capture the key information discussed in the meeting. These minutes are not all inclusive and may not cover all information discussed.
Open and Welcome
AGENDA
Co-Chairs for 1998
Discuss Law Enforcement Meeting
Review handouts from Darin Liston
Testing New Entrants
ATTENDEES
NAME
Barry Bishop Ameritech
Robin Meier Ameritech
Oc Jackson AT&T
Larry Vasquez AT&T
Jim Joerger MCI
Darin Liston Sprint
Sue Seitz Ameritech
Dan Gonos WINSTAR
Hazel Wagner B9d/Nortel
Donna Navickas Ameritech
Lorin Pollock Sprint
On Phone
Denise Thomas WorldCom
Spencer Brooks- At&T
Brenda Flood- WorldCom
HANDOUTS
Law Enforcement minutes from 12-16-97
SW Region LSR Review Meeting from October 23-24
OBF Flows
Number Pooling Flows
Minutes from Nov 18-19th Operations meeting
Meeting Discussion
Barry Bishop will be retiring from Ameritech and taking a new position with Lockheed Martin.
Oc Jackson (AT&T) and Robin Meier - RM on an interim basis- (Ameritech) will Co -Chair the LNP Operations meetings for 1998.
Law Enforcement Meeting Review
A detailed discussion took place regarding the Law Enforcement meeting.
Testing for new entrants
There are suggested tests starting at 4.3, look through these tests and determine which ones apply to your own individual network. Then contact the companies you are interested in testing with.
Number Pooling flow charts dated 12-7-97
Donna N. has the master sheet and has captured ALL changes. The remarks below have only captured some of the changes. New flows will be issued.
Number Pooling Pre-NPAC flow
Add to Box 2 - Response within 10 business days.
Add to Box 5a & 5b, note 5
Box 9 - Deletes TN inventory in the appropriate system
Number Pooling Pre- Port
Non-Contaminated- Post NPAC Requirement Implementation
Remove box 10 -
Box 2 Pool Administrator responds within 10 business days (add this information)
Box 5 - Update TN inventory in the appropriate system
Box 6 - MCI doesn’t support this box. Concern - there could be delays - could add wording not greater than 2 days.
Box 9 - Deletes TN inventory in the appropriate system
Need decision box on 1st port. If yes go to 7 then 8. If no go directly to 8.
5 day notifier on 1st port
Total of 18 days for 1st port
Add note 9 and include pool admin. Guidelines (Donna crafted words)
Number Pooling/PrePort
Contaminated - Post NPAC Requirement Implementation
Arrow on right of box 3 doesn’t belong
Box 7 SPID -Donor and recipient
NOTE: off of BOX 4 on effective date.
Box 11 should say delete TN inventory in appropriate systems.
Box 8 change wording.
Box 4 see note 11-
Issue is effective date.
Donna has wording for note.
Add decision between boxes 7,9,10 see previous pages.
NEXT OPERATIONS MEETING
Next Operations meeting will be held on January 21, 1998 with AT&T as host. Location 227 W. Monroe on the 4th floor Fargo Room.
OPEN ISSUE or topics for FUTURE MEETING
Open issue - NPA splits
Law enforcement high level guidelines.
The minutes below were provided by OC Jackson AT&T
Central Region Operations Committee
Meeting Notes
December 17, 1997
|
Name |
Company |
Tel |
Fax |
|
|
Hazel Wagner |
B9d/Nortel |
|||
|
Dan Gonos |
WinStar |
|||
|
Barry Bishop* |
Ameritech |
|||
|
Sue Seitz |
Ameritech |
|||
|
Robin D. Meier** |
Ameritech |
|||
|
Larry Vasquez |
AT&T |
|||
|
Oc Jackson** |
AT&T |
|||
|
Spencer Brooks |
AT&T |
|||
|
Jim Joerger |
MCI |
|||
|
Lorin Pollock |
Sprint |
|||
|
Darin Liston |
Sprint |
|||
|
Brenda Flood |
WorldCom |
|||
|
Donna Navickas |
Ameritech |
|||
|
Denise Thomas |
WorldCom |
* Current Committee Chairperson
** New CoChairpersons beginning January
Meeting Agenda
Review Law Enforcement Meeting
LSR and FOC Process Flows
New Entrant Process
Number Pooling flow charts
Barry Bishop is leaving Ameritech at the end of the year to work with Lockheed Martin. The new Co-Chairs are:
Oc Jackson (AT&T) 312 230-2567 -- CoChair
Robin Meier (Ameritech) (312) 220-2603 -- Temporary co-chair
Handouts
Law Enforcement minutes from 12-16-97
SW Region LSR Review Meeting from October 23-24
OBF Flows
Number Pooling Flows
Minutes from Nov 18-19th Operations meeting
Reviewed Law Enforcement Meeting
A meeting was held on 12/16/97 with Law Enforcement (LE) Representatives at the Illinois Commerce Commission. This meeting focused on LE concerns regarding Local Number Portability (LNP) and it’s impact on issues such as Wiretaps, Billing records, and other investigation efforts.
Next LE meeting will be 1/29/98 Illinois Commerce Commission 09:00 8th floor.
LSR and FOC Process Flows
Darin Liston handed out meeting minutes from the SW Region LSR Review Meeting held in Little Rock, Arkansas 10/24/97. Additionally, some OBF recommendations and different type of flow combinations for LSRs and FOCs (or new term being used is LSCs) that should be part of LSOG 4. Alot of good information in this packet, but we did not review this today it will be on the agenda when process flows are reviewed.
Darin will send this information via electronic form and this will be made available to those who need them.
New Entrant Process
There is a suggested strawman for NPAC porting tests starting in section 4.3 to review if they meet your companies needs. The new entrant also needs to contacts the other NPAC certified carriers to arrange for testing. The single point of contact for each carrier is listed on the www.ported.com web page. The new NENA standards must be in place and tested to support E911. Worldcom (who is ready to test) will contact the SP’s they would like to test with as a New Entrant.
Number Pooling flow charts dated 12-7-97
The team reviewed the Number Pooling process flows the results are in the attached file "pooling". The major changes are listed below -
Number Pooling Pre-NPAC flow
Add to Box 2 - Response within 10 business days.
Add to Box 5a & 5b, note 5
Box 9 - Deletes TN inventory in the appropriate system
Number Pooling Pre- Port
Non-Contaminated- Post NPAC Requirement Implementation
Removed box 10 - This box was removed because it was felt that this is an Intra Service Provider task, not an Inter Service Provider task.
Box 2 Pool Administrator responds within 10 business days (add this information)
Box 5 - Update TN inventory in the appropriate system
Box 6 - MCI doesn’t support this box. Concern - there could be delays - could add wording not greater than 2 days.
Box 9 - Deletes TN inventory in the appropriate system
Need decision box on 1st port. If yes go to 7 then 8. If no go directly to 8.
5 day notifier on 1st port
Total of 18 days for 1st port
Add note 9 and include pool admin. Guidelines (Donna crafted words)
Number Pooling/PrePort
Contaminated - Post NPAC Requirement Implementation
Arrow on right of box 3 doesn’t belong
Box 7 SPID -Donor and recipient
NOTE: off of BOX 4 on effective date.
Box 11 should say delete TN inventory in appropriate systems.
Box 8 change wording.
Box 4 see note 11-
Issue is effective date.
Donna has wording
NEXT OPERATIONS MEETING
Next Operations meeting will be held on January 21, 1998 with AT&T as host. Location 227 W. Monroe on the 4th floor in the Fargo Room @ 0900 Bridge 312-814-8097.
Agenda to follow.