MIDWEST REGION LNP OPERATIONS MEETING MINUTES

1-27-99

 

Next subgroup meeting: Conference Call

DATE: 2-10-99

Time: 9:00AM CST

Call in: 312-814-8097

Meet-me-bridge

Topic: Rules of Engagement Issue

Work on Straw Document provided by MCI, editing work by Tom Chowaniec

 

 

Next Midwest Region LNP Operations Team meeting Conference Call

DATE: February 24, 1999

Time: 11:00AM CST

Call in: 312-814-8097

Meet-me-bridge

 

Agenda items for 1-27-99

Intervals manual vs. EDI

LNP Contacts

New Entrant NIIF Issue 130

NIIF Issue 134 LNP Multi-Service Provider Trouble Reporting

Rules of Engagement Issue/ CLEC LNP Procedures

Other

 

Attendees 1-27-99

 

Darin Listin- Sprint-L Cynthia Hagan- McLeod USA

Dick Dowd-MCI Tammy Teague - Smithville

Roger Hixson- Ameritech Robin Meier- Ameritech

Pam Connell – AT&T Gene Perez - Intermedia

Tom Chowaniec- Ameritech Brian Van Hoof – Ameritech

 

Agenda Items:

 

 

Manual vs. EDI Intervals

Brian VanHoof provided information regarding Ameritech Interval changes. Brian stated that a letter would be forthcoming (February) outlining the specific details. Brian will provide a copy to this group when the letter becomes available. Some of the discussion points included concerns that changes would not comply with the industry agreed flows. It was mentioned that when the flows were designed the assumptions were that companies would be moving from a manual environment to an electronic environment and the transition was not moving quickly enough. Several questions were presented. One of them asking if there was a stated time frame to move from manual to electronic interfaces. No one could remember any specific time frames outlined previously and participants should review previous documentation to verify. Another question: Was this topic discussed previously in the last few Midwest Region Operations meetings? No, it wasn’t. The topic was scheduled for the December conference call and was postponed at the last minute, due to unexpected, last minute conflict of SME.

 

 

LNP Contacts

The National LNP Operations team has provided a LNP Contact list. The list was provided to this group for review, changes and comments. There was discussion on where the contact list should be available and maintained. It was noted that contact information is provided at the time of interconnection agreements with specific companies. LNP contact information could be listed on NPAC.com, Ported.com or at the NIIF in the Contact Directory. Further discussions will take place at the National LNP Operations meeting. If anyone identifies changes in the LNP Contact sheet, changes can be sent to either Gene Perez directly or via Robin Meier.

 

 

New Entrant NIIF Issue 130

This issue remains in active status and is progressing. Changes made in the January meeting will be provided when they are available.

 

New Issue NIIF 134 LNP Multi-Service Provider Trouble Reporting

This issue remains in active status and more information is needed to effectively work it. Additional information is needed to understand the types of LNP trouble cases reported and suggested solutions. If your company is aware of common LNP trouble cases and possible solutions for resolution please contact your company NIIF representative or Robin Meier.

 

Rules of Engagement Issue/ CLEC LNP Procedures

Discussion identified that the MCI contribution contains a lot of the information needed for a guidelines document. The MCI straw document was selected for on-going work in the rules of engagement issue. It was decided that a sub group of interested parties would work on revising this document in a series of conference calls. The first one is scheduled for 2-10-99. Everyone is welcome and encouraged to participate. A working copy was sent out earlier today (2-1-99.)

 

Other

Gene Perez provided meeting dates for various LNP Operations teams regionally:

The regions shared meeting dates in an attempt to avoid conflicting meetings

1/27 Midwest Region

2/3 W

2/4 Law Enforcement-Tampa

2/10 Midwest Region

2/16 SE

2/18 NE/MA

2/23-24 SW/WC

2/24 Midwest Region

3/1 Cross Regional Conf Call

3/3-4 NIIF-NIMC Williamsburg

3/4 W

3/11 SE

3/23-24 SW/WC

3/30 NE/MA

4/7-8 NPAC Cross Regional - Dallas

4/20-21 SW/WC

5/18-19 SW/WC

6/16-17 SW/WC

 

 

Wireless/Wireline

Darin gave an impromptu update of the Wireline/Wireless progress made by the LNPA Working group. Darin sent a draft copy of the work to date. This is not a final and is still in the process of review and on-going changes. The copy was sent earlier today (2-1). Contact your company LNPA Working Group member with any comments/questions.

 

New Issues,

Contact Robin Meier prior to the next meeting (2-24) with any new issues or concerns to be added to the agenda.

 

 

ICC Steering Committee Report-out January 28, 1999

A copy of the report for the ICC Steering Committee Meeting is attached. Items listed were briefly discussed in the meeting.

 

Robin Meier

Midwest Region LNP Operations Team

 

 

 

MIDWEST REGION OPERATIONS TEAM UPDATE

FOR THE JANUARY 28

ICC STEERING COMMITTEE MEETING

 

 

Meetings held from 10-01-98 to 01-28-99

 

 

 

 

FUTURE MEETINGS

 

Conference Call to work "Rules of Engagement Document"

02-10-99

9:00 am CST

Call-in meet me bridge 312-814-8097

 

Conference Call monthly update

02-24-99

11:00 am CST

Call-in meet me bridge 312-814-8097

 

National Law Enforcement Meeting

2-4-99, 10:00 am to 4:00 pm

Tampa, Florida

Host -GTE

One Tampa City Center- Downtown Tampa

Hillsborough Room - 3rd floor

Business Casual

 

 

 

 

 

 

Robin Meier

Midwest Region LNP Operations Team